Reliant FVIR GAS WATER HEATER Technical Information Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 75
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
RESIDENTIAL GAS AND ELECTRIC WATER HEATER
TROUBLESHOOTING and SERVICE HANDBOOK
RELIANCE Water Heater Company Technical Training Department
©2006 Ashland City, TN
21
A "five point inner door seal inspection" is outlined below:
Five point inner door seal inspection:
1. Inner door gasket condition and fit.
2. Main burner tube seal condition and fit.
3. Pilot assembly seal condition and fit.
4. Sight glass, condition; present, not broken or cracked.
5. Straight routing of the thermocouple and pilot burner tube through the pilot assembly seal.
These are all critical to maintaining the C3 TECHNOLOGY integrity of the combustion chamber.
PIEZO IGNITER
C3 TECHNOLOGY models will feature a Piezo igniter to light the pilot burner.
The push button switch will be located on the top of the gas control valve. There will be a plug connector
between the push button and the igniter wire which is part of the pilot burner assembly.
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 74 75

Comments to this Manuals

No comments